Let PMs manage, not chase documents.
Turn your APMs into super employees
Deep Mag plugs into your construction documents to read submittals, drawings, specs, and codes in seconds. We flag inconsistencies, auto-generate RFIs, assist with safety planning, generate schedules, and catch permit and submittal issues before they impact your project.
70-80%
Reduction in manual review effort on complex submittals
>30 sec
To get critical answers
25 hrs/week
Saved per project team
Deep Mag Suite
Submittal Review
Flags conflicts vs drawings & specs
RFI Generator
Drafts questions from discrepancies
Permit Checker
Compares local code, IBC & contract docs
Live with Procore, CMiC, Autodesk, Dropbox, Google Drive & SharePoint Online.
Five Agents. One AI solution.
Built for construction teams who live in submittals, RFIs, permits, schedules, and safety.
Submittal Agent
Compares subcontractor documents against contract drawings and specs to surface inconsistencies before approval.
Learn more →RFI Agent
Finds discrepancies across specs, drawings, and standard details, then drafts RFIs ready for your review.
Learn more →Permit Agent
Checks local codes, IBC, drawings, and specs to catch compliance issues before they create permit delays.
Learn more →AI submittal review that actually reads the contract documents.
Deep Mag compares every submittal against the contract drawings and specifications to find mismatches, missing information, and noncompliant products—before you stamp it.
Auto-detect new submittals. Webhooks detect when a submittal is created in your system and pull it into Deep Mag with the referenced drawings and specs.
Compare against contract intent. We line up the submittal against the relevant sheets and spec sections to flag inconsistencies, errors, and missing data.
Deliver an issues list. Get a structured list of issues sent to the submittal manager via email—or review and resolve them directly inside Deep Mag.
Submittal · Fire Rated Doors
Issues found: 5
- · Hardware set does not match Spec 087100 Section 3.4.
- · Glass rating listed as 45 min; contract drawings call for 60 min.
- · Missing evidence of compliance with local egress code amendment.
Let AI find the discrepancies and draft the RFIs.
Deep Mag scans specs, drawings, and typical design details to catch contradictions and gaps, then drafts clear questions you can send to the design team with one click.
Ingest drawings and specs. Connect Procore, Autodesk, or your document storage and let Deep Mag sync the latest sets.
Generate an RFI list. We compare cross-trade details to find missing dimensions, conflicting notes, and design assumptions that need clarification.
Send RFIs in draft mode. Push RFIs back into your system of record—like Procore—as drafts so your team can review and issue them formally.
Draft · RFI-014 · Slab Edge Detail
A/502 Detail 3 calls for 6" slab recess at balconies, while S/301 shows flat slab at same gridlines. Please confirm intended condition and update structural/architectural coordination.
Attachments: A/502, S/301 markups. Status: Draft in Procore.
Code, IBC, and contract compliance in one view.
Deep Mag looks at the project’s location, applicable local building codes, IBC edition, and your contract documents to highlight anything that could slow down permit approval.
Map project to the right codes. Using data from Procore, we identify jurisdiction, local amendments, and which IBC version applies based on the code sheets.
Scan drawings and specs for compliance. We check contract drawings and spec sections against local codes, IBC, and any additional codes listed on the code sheet.
Produce a permit variance report. See exactly which sheets, details, or spec sections need updates—along with suggested adjustments to keep the permit path clear.
Project · Midrise Residential
3 code discrepancies detected
- · Local fire code requires additional stair pressurization; not shown on M-502.
- · IBC edition on code sheet does not match structural load tables used.
- · Accessible parking count under local ordinance exceeds current site plan.
Break down drawings into actionable tasks and build your schedule.
Deep Mag analyzes your project drawings to extract work tasks, then prompts you for key project parameters—start date, number of floors, and phases—to generate a comprehensive construction schedule. A sub-agent identifies potential delays, including upcoming weather delays, to keep your schedule on track.
Break down drawings into actionable tasks. We analyze your project drawings to identify all work items, from foundation to finishes, and organize them into discrete, schedulable tasks.
Establish and prompt for a start date. Deep Mag asks you to set the project start date, which becomes the anchor point for all schedule calculations and task sequencing.
Ask for floors and phases. We prompt you to specify how many floors and phases your project has, then organize tasks accordingly to create a logical, phased construction schedule.
Identify potential delays. A sub-agent monitors your schedule and identifies potential delays, including upcoming weather delays, so you can proactively adjust your timeline and keep the project on track.
Project · Office Building
Tasks extracted: 142
- · Start date: March 1, 2025
- · 12 floors, 3 phases
- · Schedule organized by phase: Foundation → Structure → Enclosure
- · Weather delay alert: Heavy rain forecasted March 15-17
From planning JSAs to developing crane plans, this is your tool.
Deep Mag reviews project documents to identify safety risks, generate Job Safety Analyses (JSAs), develop crane lift plans, and ensure compliance with safety regulations and best practices.
Analyze project documents for safety risks. Review drawings, specs, and site conditions to identify potential hazards, high-risk activities, and areas requiring special safety measures.
Generate safety planning documents. Create comprehensive JSAs, crane lift plans, and safety protocols based on the work scope, site conditions, and applicable safety standards.
Ensure compliance and best practices. Verify that safety plans meet OSHA requirements, local regulations, and industry best practices before work begins.
Project · High-Rise Construction
Safety risks identified: 8
- · JSA generated for tower crane installation (S/401, A/205)
- · Crane lift plan required for 12-ton HVAC unit at Level 15
- · Fall protection needed: 3 areas with unprotected edges identified
Plug into the Agents your teams already use.
Deep Mag connects with your project management, scheduling, and file storage systems so AI reviews happen in the background—without changing where your teams work.
Project & Docs
Autodesk, Procore, SharePoint Online
Scheduling & Files
P6, Dropbox, Google Drive
We respect your permissions and audit trails—every action is logged and scoped to what your admins approve.
Live Sync Snapshot
Today's activity
· 18 new submittals pulled from Procore for review.
· 9 RFIs drafted and pushed back as drafts to Procore.
· 4 permit variance reports generated from updated code sheets.
Book a Demo
See Deep Mag on your own project documents.
Share a live project—submittals, drawings, specs, and permit path—and we'll walk your team through how Deep Mag flags issues across all our Agents in minutes.
No spam—just a short discovery call and a live walkthrough with your own documents.
